ENTERPRISE OS // COMMAND CENTER v4.2LIVE TELEMETRY

Treasury & Financial Control Cockpit

Active filter: All job sites (Cancún, Riviera Maya, Tulum) • Weekly close Q3 • Continuously syncing with SAT (CFDI 4.0) and SPEI/STP

WEEK 38 · 2024
Committed Treasury
$38,420,000MXN
4 job sites on scheduled payout
Disbursements Authorized Today
$1,842,500MXN
100% CROSS-CHECKED18 folios closed
Leaks / Disputed Withholdings
$182,300MXN
ACTIVE ALERTTulum site (steel)
Net Operating Margin
31.8%+2.1% vs. budget

Disbursements & Purchases in Transit

Three-way algorithmic validation: SAT CFDI + EXIF ticket + GPS geofence

5 PENDING RECORDS
Folio / SiteVendor / ItemAmount3-Way ValidationStatusAction
#CT-8921
Punta Sam
Cemento Cruz Azul
400 Type II bags (Slab 4 pour)
$132,400.00
AUTO-APPROVED
#CT-8924
Torre Kukulcán 14
Maquinaria Peninsular S.A.
Monthly rental — CAT 320 backhoe
$245,000.00
EXEC. SIGN-OFF
#CT-8929
Tulum site
Aceros del Mayab
1/2-inch rebar (32 tons)
$182,300.00
BLOCKED
#CT-8930
Hotel Holbox
Consorcio Carpinteros Caribe
Week 38 installer crew
$84,600.00
AUTO-APPROVED
Zero tolerance for deviations: 3 physical validation checks before the bank STP instruction is issued.
HISTORICAL RECORDS →
Direct STP Bank Status
Financial Gateway Online
LATENCY 42ms

Bridge credit line and master accounts at BBVA and Banorte, ready for 24/7 invoicing with no intermediaries.

SAT Cryptographic Vault
CFDI 4.0 Sync Active
SYNC EVERY 15 MIN

Instant blacklist status checks (Art. 69-B CFF) and real-time invoice cancellation.

CRITICAL DISCREPANCY DETECTED

Tulum site: steel overcharge

The vendor Aceros del Mayab issued delivery note #R-4491 at a unit price +8.4% above the indexed Master Contract.

MARGIN IMPACT:-$14,200 MXN per lot

Margin Health by Project

Physical site progress vs. financial spend

Residencial Punta SamOPTIMAL
Physical: 68.4%Financial: 65.0%
Margin held in reserve: 34.2%+3.4% favorable gap
Torre Kukulcán 14GLAZING REVIEW
Physical: 42.1%Financial: 44.0%
Alert: aluminum line item delayed-1.9% financial gap
Hotel Boutique HolboxHANDOVER PHASE
Physical: 89.0%Financial: 88.5%
Contractor closeouts at 92%+0.5% stability
Algorithmic Certainty Index99.4% RELIABILITY
Executive Token Key
ID: CARTIAM-SES-94812
NODES: 14 ACTIVE (CANCÚN CLUSTER)
NETWORK LATENCY: 12msAUDIT HASH: SHA256: 7f8a9...b1048 MODULES · 7 ROLES · 99.98% UPTIME
IMMUTABLE RECORDSZERO-TRUST VERIFIED
Enterprise OS — CartiamAI